Vote in the European Parliament
Electricity grids: the backbone of the EU energy system
Anna Stürgkh – Motion for a resolution (as a whole)
Date: 19.06.2025Reference: A10-0091/2025regulatory policyfund (EU)trans-European networkcross-border dimensionenergy productionenergy distributiondigital transformationenergy consumptioninvestmentcompetitivenessenergy grid
Overall Result
- 418 For
- 112 Against
- 45 Abstention
- 144 Did not vote
How we count
- Yes, No and Abstention come from the European Parliament's roll-call voting protocol.
- “Did not vote” is derived: MEPs with a mandate on the voting day for whom no vote was recorded. Abstentions do not count towards this.
- Subsequent vote corrections are shown but do not change the official result.
- Each vote (overall vote, amendment, partial vote) counts separately. Therefore totals may differ from pages that count differently.
Status
Adopted
Outcome as recorded by the European Parliament.
- Vote held on
Procedure timeline
No procedure timeline is available for this vote yet.
Sources
Data: EP Open Data API
What is this about?
- Power grids as key enabler for climate neutrality by 2050 .
- Investment needs of €1.950–2.600 billion by 2050 for networks.
- Accelerating permitting processes for grid expansion by June 2026 .
Vote by political group
How the political groups voted
For10
- 10For
- 11Against
- 1Abstention
- 8Did not vote
For35
- 35For
- 23Against
- 5Abstention
- 16Did not vote
For107
- 107For
- 5Against
- 0Abstention
- 24Did not vote
For51
- 51For
- 0Against
- 0Abstention
- 2Did not vote
For59
- 59For
- 0Against
- 0Abstention
- 16Did not vote
For132
- 132For
- 1Against
- 6Abstention
- 49Did not vote
For24
- 24For
- 0Against
- 10Abstention
- 12Did not vote
For0
- 0For
- 47Against
- 23Abstention
- 15Did not vote
For0
- 0For
- 25Against
- 0Abstention
- 2Did not vote
Members
Showing 10 of 719
| Name | Country | Group | Vote Position |
|---|---|---|---|
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For |