Vote in the European Parliament
Electricity grids: the backbone of the EU energy system
Anna Stürgkh – § 9 – Am 6
Date: 19.06.2025Reference: A10-0091/2025regulatory policyfund (EU)trans-European networkcross-border dimensionenergy productionenergy distributiondigital transformationenergy consumptioninvestmentcompetitivenessenergy grid
Overall Result
- 158 For
- 389 Against
- 32 Abstention
- 140 Did not vote
How we count
- Yes, No and Abstention come from the European Parliament's roll-call voting protocol.
- “Did not vote” is derived: MEPs with a mandate on the voting day for whom no vote was recorded. Abstentions do not count towards this.
- Subsequent vote corrections are shown but do not change the official result.
- Each vote (overall vote, amendment, partial vote) counts separately. Therefore totals may differ from pages that count differently.
Status
Rejected
Outcome as recorded by the European Parliament.
- Vote held on
Procedure timeline
No procedure timeline is available for this vote yet.
Sources
Data: EP Open Data API
What is this about?
- Power grids as key enabler for climate neutrality by 2050 .
- Investment needs of €1.950–2.600 billion by 2050 for networks.
- Accelerating permitting processes for grid expansion by June 2026 .
Vote by political group
How the political groups voted
For8
- 8For
- 3Against
- 10Abstention
- 9Did not vote
For61
- 61For
- 0Against
- 2Abstention
- 16Did not vote
For72
- 72For
- 0Against
- 0Abstention
- 13Did not vote
For11
- 11For
- 0Against
- 14Abstention
- 2Did not vote
For1
- 1For
- 112Against
- 0Abstention
- 23Did not vote
For4
- 4For
- 131Against
- 6Abstention
- 47Did not vote
For1
- 1For
- 33Against
- 0Abstention
- 12Did not vote
For0
- 0For
- 51Against
- 0Abstention
- 2Did not vote
For0
- 0For
- 59Against
- 0Abstention
- 16Did not vote
Members
Showing 10 of 719
| Name | Country | Group | Vote Position |
|---|---|---|---|
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For | |||
For |