Vote in the European Parliament

Implementation report on the Recovery and Resilience Facility

Victor Negrescu, Siegfried Mureşan – § 7 – Am 15
Date: 18.06.2025·Reference: A10-0098/2025
Rapporteur: Victor Negrescu, Siegfried Mureşan

Overall Result

Rejected
  • 114 For
  • 458 Against
  • 81 Abstention
  • 66 Did not vote
Amendment— You are viewing a sub-vote (amendment) of the main vote.Amendment 15 · Tabled by PfEView amendment at the EP ↗
Amendment wording

Tabled by Enikő Győri, Paolo Borchia, Jorge Martín Frías

7. Notes that Removed: the RRF has incentivised the implementation of some Added: there is no clear evidence that the RRF would be a catalyst for the reforms included in the country-specific recommendations made in the context of the European Removed: Semester through the inclusion of such reforms in the NRRPs; Added: Semester, as it is difficult to see any significant difference in the implementation progress between the periods of 2011-2018 and 2019-20221a; underlines that there has been a qualitative leap forward in terms of … the context of the European Semester remains low and has even dropped; Added: 1a Economic Governance and EMU Scrutiny Unit (EGOV), ‘Economic Dialogue with the European Commission on the launch of the 2025 European Semester cycle’, In-Depth Analysis, 23 January 2025, p. 12.

Wording as published by the EP, in English. PE773.951v01-00

← Back to Main Vote
Status and procedure

Outcome as recorded by the European Parliament.

Vote held on
Latest recorded step
Plenary · (534 days ago)
Next scheduled step
No further step is scheduled in the source.

Procedure timeline

2024/2085(INI) · INI

Recorded procedure activities. These do not establish whether a law has entered into force.

  1. Recorded: Referral57 days until the next step
  2. Recorded: Committee stage124 days until the next step
  3. Latest recorded: Plenary534 days since this step began
Recorded activities (22)
  1. Referral to committee
  2. Committee report tabled
  3. Committee opinion tabled
  4. Committee opinion tabled
  5. Committee opinion tabled
  6. Committee opinion tabled
  7. Committee amendments tabled
  8. Committee opinion adopted
  9. Committee opinion adopted
  10. Committee opinion adopted
  11. Committee opinion adopted
  12. Committee report adopted
  13. Tabling for plenary
  14. Tabling for plenary
  15. Tabling for plenary
  16. Tabling for plenary
  17. Tabling for plenary
  18. Tabling for plenary
  19. Tabling for plenary
  20. Plenary debate
  21. Plenary vote
  22. Plenary vote results
Scheduled activities (not confirmation of completion)
  1. Plenary debate
  2. Plenary vote

Procedure file (OEIL) · European Parliament data
Retrieved:

Sources

Data: EP Open Data API

What is this about?

  • Recovery and Resilience Facility (RRF) as crisis tool until 2026 .
  • 95 payment requests submitted, €197 billion disbursed.
  • €25–30 billion annual repayment costs from 2028 .
Source: AI Summary with Mistral

Vote by political group

How the political groups voted

Members

Showing 10 of 719

Vote Position
NameCountryGroupVote Position
CzechiaPfE
For
GermanyESN
For
PolandECR
For
FranceECR
For
CzechiaPfE
For
GermanyESN
For
CzechiaNI
For
PolandECR
For
ItalyPfE
For
HungaryPfE
For
Show more
Follow us on Instagram@checksomevotes@checksomevotes_en